New Office / Construction Planning

Technology needs a plan before the walls close.

New offices and major build-outs need Wi-Fi, cabling, device locations, network rooms, internet handoffs, cameras, access control, phones, and power planned while the space can still be changed.

Why early planning matters

A finished office can still be technology unfinished.

The right time to plan technology is before framing, rough-in, ceilings, and finishes lock the space into expensive compromises.

Technology added too late
  • Walls close before cable pathways, device locations, and network needs are settled
  • Access points end up wherever cable was easiest, not where coverage is needed
  • Printers, desks, cameras, doors, and shared equipment are planned after finish-out
  • Electricians, contractors, internet providers, and IT vendors work from different assumptions
  • The space looks finished, but the technology is not ready for opening day
Technology planned early
  • Technology needs are reviewed while framing, rough-in, and trade coordination can still change
  • Wi-Fi, network, cable pathways, rack locations, and device placement are planned together
  • General contractors, electricians, and other trades get clearer technology requirements
  • Cabling, power, conduit, internet handoffs, and equipment locations are coordinated earlier
  • The new space opens with a supportable technology foundation
Planning scope

What gets planned before rough-in.

This is not a small-drop service page. It is the planning layer for the technology foundation of a new space.

Network foundation

Firewall, switching, rack location, VLAN needs, internet handoff, network rooms, and the physical layout behind the office network.

Wi-Fi coverage planning

Access point placement, coverage expectations, heatmap-style planning, density needs, guest Wi-Fi, and areas that cannot be guessed from a box.

Cable pathway design

Cable routes, sleeves, conduit needs, ceiling access, wall locations, pathways between rooms, and room for future expansion.

Device location planning

Computers, printers, conference rooms, access points, cameras, door access, time clocks, point-of-sale devices, and shared equipment.

Camera and access rough-in needs

High-level location planning and infrastructure requirements so the camera and access control page can handle the system details later.

Power and low-voltage coordination

Where technology needs power, data, PoE, cabinets, UPS space, conduit, or separation from other trades.

Trade coordination

Practical coordination with general contractors, electricians, low-voltage crews, carriers, security vendors, and internal business stakeholders.

Documentation and handoff

Plans, notes, device locations, cable intent, rack expectations, and opening-day technology requirements that are easier to follow.

Build-out stages

We plan around the construction timeline.

Framing, metal studs, rough-in, ceilings, electrical, low-voltage, internet service, and finish-out all affect the final technology experience.

Floor plan review

We look at desks, conference rooms, doors, counters, equipment spaces, user flow, and the areas that need reliable service.

Framing and rough-in planning

The best time to make changes is before walls close. We identify cable paths, device locations, conduit needs, and trade dependencies early.

Coverage and pathway layout

Wi-Fi, network drops, camera rough-in, access points, rack placement, and cable routes are treated as one connected plan.

Opening-day readiness

The goal is not just installed cable. The goal is a new space where internet, Wi-Fi, phones, printers, cameras, access, and users can work on day one.

Why ProTek

We keep technology from becoming an afterthought.

A new space should not open with dead zones, missing jacks, no room for network gear, bad camera rough-ins, or last-minute trade confusion.

We get involved before the walls close

Technology planning has the most value while the space can still be adjusted. Waiting until finish-out usually means compromises.

We plan the whole foundation

Low-voltage, Wi-Fi, network rooms, internet handoff, power needs, cameras, access control, and user locations all affect each other.

We speak contractor and IT

General contractors, electricians, carriers, vendors, and business owners need clear requirements. We help translate the technology side into practical field decisions.

We keep this distinct from small cabling jobs

This is for build-outs, remodels, and new spaces. If you just need a drop, cable repair, or cleanup, the cabling page is the better fit.

Clear process

From floor plan to opening day.

We help define the technology requirements before the job site gets too far ahead of the business.

1

Review the plans

We review floor plans, user locations, rooms, doors, service entry, network spaces, and how the business will actually use the building.

2

Map technology needs

Wi-Fi, network, computers, printers, phones, cameras, access control, sensors, shared systems, and future growth are mapped before rough-in.

3

Coordinate requirements

Cable pathways, conduit, rack space, power, carrier handoff, and trade responsibilities are clarified before work starts.

4

Support rough-in and build-out

We help keep technology decisions aligned while framing, metal studs, ceilings, electrical, low-voltage, and finish-out work happen.

5

Prepare for opening day

Before the space goes live, the plan is checked against internet, Wi-Fi, network equipment, device locations, and business-critical systems.

Plan the technology before the build-out locks it in.

Bring ProTek in early so the new office is wired, covered, coordinated, and ready for the business on day one.