Back to Our Work
Project

Main Level Run, Down Into the Basement

October 30, 2026On-Site
  • networking

This is a main level run going down into a basement. Every run from upstairs comes through the top plate in two clean bundles, strapped the whole way down, and lands in one spot where the rack will live. One photo is that landing spot before we dressed it down: every run in the house, one pile, one plan. The last photo is those same runs dressed: two bundles, straight and strapped the whole way down. No spaghetti in the walls, nothing for the drywall crew to guess at. You only get one shot at this part, before the walls close. Wiring a house? Call ProTek at 256-489-2904.