Back to Our Work
Project

Rough-In Done Right, Ready for Drywall

October 30, 2026On-Site
  • networking

This is what a rough-in should look like before the drywall goes up. Main trunk run strapped in clean, and a conduit left open for the internet provider with mule tape already in it. When their tech shows up, he ties his line on and pulls straight through. No fishing, no fighting it. No magic to it, just making it easy for the next guy. The second photo is the middle of the job: the main bundle getting combed out straight before a single strap went on. Building a home or wiring one out? Get ProTek in before the walls close up. Call us at 256-489-2904.