Back to Our Work
Project
Sheetrock First, Holes Later
Sheetrock went up before the holes were drilled. The wiring was already in place, so getting it through the door frames was the interesting part. Ready
October 10, 2026On-Site
- networking
Sheetrock went up before the holes were drilled. The wiring was already in place, so getting it through the door frames was the interesting part. Ready for the sensors.
More on-site projects

Door Sensor and Monitoring Panel Wiring
Finishing up wiring in door sensors and monitoring panels.

Access Control Installation
Need access control? We do that. Professional access control system installation for businesses.

Whole-Home Audio Install
Whole-home audio, finished and sounding great. Music in the kitchen, something different on the patio. Each area is controlled separately so everyone can enjoy their own music.